Uploaded image for project: 'Fault Management'
  1. Fault Management
  2. DOCTOR-14

Editorial changes in Section 5.2.2 NFVI Maintenance

    XMLWordPrintable

    Details

    • Type: Improvement
    • Status: Closed (View Workflow)
    • Priority: Minor
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: None
    • Labels:

      Description

      1) Section 5.2.2 NFVI Maintenance lists a set of steps for this procedure. Steps A and B have been "numbered" as A and B, as they are not necessarily follwing step 10, but can be executed at any time.

      Bug: the PDF (http://artifacts.opnfv.org/doctor/DoctorFaultManagementandMaintenance.pdf) does not correctly list steps A and B.

      2) in the description of Fig. 5.5 it says
      "Figure 5.5 shows a more detailed message flow (Steps 4 to 6) between the 4 building blocks introduced in Section 5.1", but it should be "...(Steps 3 to 6 and 9)..."

      3) If possible, the description of a Figure should be after the Figure was introduced.

        Attachments

        # Subject Branch Project Status CR V

          Activity

            People

            Assignee:
            bertys Bertrand Souville
            Reporter:
            kunzmann Gerald Kunzmann
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved: